Hollywood Theater RFP Addendum No. 4: Additional Bids Solicited

All work for the Hollywood Theater is open for rebidding. The revised bid format is intended to solicit responses from qualified General Contractors, under one prime contract. The revised bid form includes one bid for the base scope of work, including a line item break‐out of the Legacy Grant work, and a line item break‐out of the proposed add‐alternate scopes of work. All previously submitted bids have been rejected.

Access to the interior of the building will be available by request. Send walk‐thru requests in writing to Casie Radford. There is not a required pre‐bid meeting or walk‐thru. Responses will also be accepted from contractors that did not attend the May 14 pre‐bid meeting.

Proposals must be in writing and received electronically no later than June 26, 2015 at 5:00 p.m. in order to receive consideration.

All previous addenda are still applicable to this re-bid. Revised bids shall follow the proposal requirements as outlined in the initial RFP and Addenda 1, 2, and 3

Download a PDF of the Addendum No. 4.

Download a PDF of Addendum No. 5 here.